Durell Partners News and Events Employment Opportunities at Durell Contact Us
 

Testimonials

Customers

 

Durell has a very impressive portfolio of customers, partnerships and awards. This section of our web site outlines our testimonials, Delta partnership and awards recently received for our outstanding work.

Post Secondary Education Facilities

University of Western Ontario

University of Western Ontario
London, Ontario

  • Electronic Controls
  • Pneumatic Controls
  • Central Operations Facility
  • OWS Graphics
  • 50,000+ points

As an original partner of Delta Controls, the University of Western Ontario is one of the largest Delta installations in the world. With over 50 Buildings, offices, and residences on a single network, UWO is a sure demonstration of Delta's BACnet/IP networking scalability.

Middlesex College, UWO

Biotron
London, Ontario

  • Electronic Controls
  • Pneumatic Controls
  • Central Operations Facility
  • OWS Graphics

The Biotron will furnish a unique world wide nexus for basic biological and environmental research at the ecological, physiological and molecular levels.

Biotron

Animal Care and Use
London, Ontario

  • Electronic Controls
  • OWS Graphics

 

Animal Care

Fanshawe College
London, Ontario

  • Electronic Controls
  • Central Operations Facility
  • OWS Graphics

The entire London campus of Fanshawe College is fitted with Delta controllers. 16 buildings including 2 residences are connected via Ethernet.

M Block, Fanshawe College

Fanshawe College, St. Thomas
St Thomas, Ontario

  • Electronic Controls
  • Pneumatic Controls
  • Central Operations Facility
  • OWS Graphics

Affiliated with Fanshawe College London and monitored remotely via WAN connection.

Fanshawe College St Thomas

Robarts Research Institute
London,Ontario

 

This state of the art building expansion officially opened in 2003 doubling the space available for research to nearly 200, 000 sq. ft. The expansion was totally outfitted using Delta controls for both the HVAC system and lighting. The owners also requested power metering and steam metering to calculate operating costs for the building. This was all made possible using Delta controls.

Robarts Research Institute Expansion

Boards of Education

Thames Valley District School Board

Currently Durell Controls has 44 TVDSB schools tied to a central server that utilizes ORCAweb. Remote access allows maintenance personnel the cost saving ability to remotely investigate a problem before arriving onsite. With the use of login restrictions, custodiansare able to log onto the Delta system and create event schedules and adjust set points. This customer has also experienced substancial savings due to efforts around energy management.

 

 

tvdsb

Lambton-Kent District School Board

Presently Durell Controls has 25 LKDSB schools tied to a central router that utilizes ORCAview, allowing maintenance personnel to connect to all Delta sites. Durell has had a long term relationship with the LKDSB. Some sites are still operating on V2 Delta controllers installed in the early 1990’s. We have successfully integrated both the V2 and newer V3 versions of Delta controllers they appear seamless over the graphical user interface. Please see our backwards compatibility section under integration solution for more details.

LCCVI

Hospital and Medical Facilities

Woodstock General Hospital

 

 

Woodstock General Hospital utilizes Delta Version 2 hardware and software. This original Delta product is quite robust and WGH is a prime example of the durability and support which drives the Delta Legacy.

WGH

Meaford Hospital

Meaford Hospital is another original Version 2 Delta installation serviced by Durell Controls. Remote monitoring using Delta Igraph software keeps Meaford Hospital operating smoothly.

Meaford

St. Thomas-Elgin General Hospital
St. Thomas, Ontario

  • Electronic Controls
  • Pneumatic Controls
  • Access Controls
  • OWS Graphics
  • 1700 points
  • 1000 card users

Durell Controls installs and services card access control at STEGH. With the use of Delta’s card access platform, Durell Controls has provided an integrated HVAC and card access system that incorporates 1,000 card users. All HVAC and access information is available through one seamless graphical user interface.

St Thomas

Strathroy-Middlesex General Hospital

  • Electronic Controls
  • OWS Graphics

SMGH is a full V2 V3 integrated building. Durell Controls has implemented a wide range of control strategies including isolation room pressure monitoring and alarming as well as HEPA exhaust fan control.

SMGH

Hanover and District Hospital
Hanover, Ontario

 

  • Electronic Controls
  • OWS Graphics

 

Hanover H

Cities and Townships

Facilities for the City of London


Durell Controls has installed Delta HVAC control in many City of London buildings. Arenas, Fire Stations, Court Offices, Maintenance Facilities as well as the Museum and City Hall are just some examples. The City of London utilizes a V2-V3 integrated ORCAweb platform communicating over the City’s wide area network. All supervisors, operators and maintenance personnel have access to the Delta system. .

City Of London

Facilities for the City of Sarnia
City Hall
Police Station
Library
Arenas

 

Other Commercial and Government Facilities

Western Fair Association
London, Ontario

  • Electronic Controls
  • OWS Graphics
  • 15,000+ points

Race Track, Slots, 4-Pad, Agriplex, Pavilions

Western Fair

Hanover Civic Centre

 

Royal Bank Tower
 London, Ontario

 

Veterinary Purchasing
St. Mary's, Ont